Home > Minutes by Project

Minutes by Project

To view minutes by project, select the drop down and select the appropriate project.

Minute 332 and Joint Report PE

Construction of a Composite Cutoff Wall to Reduce the Risk of Failure at Amistad International Dam

Minute 330

Expansion of Colorado River Temporary Measures

Minute 329

Adoption of a Machine-Readable means of Identification of Personnel Crossing the International Boundary on Official Business of the Commission or of either section (English Version only).

Minute 328

Sanitation Infrastructure Projects in San Diego, California – Tijuana, Baja California for Immediate Implementation and for Future Development.

Minute 327

Emergency Deliveries of Colorado River Waters for use in the City of Tijuana, Baja California

Minute 326

Rehabilitation of the International Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona

Minute 325

Measures to End the Current Rio Grande Water Delivery Cycle Without a Shortfall, to Provide Humanitarian Support for the Municipal Water Supply for Mexican Communities, and to Establish Mechanisms for Future Cooperation to Improve the Predictability and Reliability of Rio Grande Water Deliveries to Users in the United States and Mexico

Minute 324

Location, Demarcation and Monumentation of the International Boundary Line on the New Bridge and Demolition of the Old Bridge Over the Rio Grande between Tornillo, Texas and Guadalupe, Chihuahua.

Minute 323

Joint Report of the Principal Engineers with the Implementing Details of the Binational Water Scarcity Contingency Plan in the Colorado River Basin
(See Report)

Joint Report of the Principal Engineers with the Operational Provisions Applicable to Water for the Environment Stipulated in Minute 323 (See Report)

Binational Study of Water Desalination Opportunities in the Sea of Cortez

Minute 322

Updated Joint Report of the Principal Engineers to Facilitate Emergency Delivery of Colorado River Water for Use in Tijuana, Baja California
(See Report)

Minute 321

Official Means of Identification of Vehicles and Other Equipment Crossing the International Boundary on Official Business of the Commission or of Either Section.

Minute 320

General Framework for Binational Cooperation on Transboundary Issues in the Tijuana River Basin; Minute 320 webpage

Minute 319

Interim International Cooperative Measures in the Colorado River Basin through 2017 and Extension of Minute 318 Cooperative Measures to Address the Continued Effects of the April 2010 Earthquake in the Mexicali Valley, Baja California.

Fact Sheet on Minute 319
Fact Sheet on Minute 319 Environmental Flow

Minute 318

Adjustment Of Delivery Schedules for Water Allotted to Mexico for the Years 2010 Through 2013 as a Result of Infrastructure Damage in Irrigation District 014, Rio Colorado, Caused by the April 2010 Earthquake in the Mexicali Valley, Baja California. (Signing Ceremony Photo)

Minute 317

Conceptual Framework for U.S.-Mexico Discussions on Colorado River Cooperative Actions

Minute 316

Utilization of the Wellton-Mohawk Bypass Drain and Necessary Infrastructure in the United States for the Conveyance of Water by Mexico and Non-Governmental Organizations of Both Countries to the Santa Clara Wetland during the Yuma Desalting Plant Pilot Run

Minute 315

Adoption of the delineation of the international boundary on the 2008 Aerial Photographic Mosaic of the Rio Grande (Joint Report) Spanish

Minute 314

Extension of the Temporary Emergency Delivery of Colorado River Water for Use in Tijuana, Baja California (Joint ReportSpanish

Minute 313

Maintenance in the Rectified Channel of the Rio Grande (Joint Report)

Minute 312

Official Means of Identification of Personnel, Vehicles, And Other Equipment Crossing the International Boundary on Official Business of The Commission or of Either Section

Minute 311

Recommendations for Secondary Treatment in Mexico of the Sewage Emanating from the Tijuana River Area in Baja California, Mexico

Minute 310

Emergency Delivery of Colorado River Water for use in Tijuana, Baja California

Minute 309

Volumes of Water Saved with the Modernization and Improved Technology Projects for the Irrigation Districts in the Rio Conchos Basin and Measures for Their Conveyance to the Rio Grande

Minute 308

United States Allocation of Rio Grande Waters During the last Year of the Current Cycle

Minute 307

Partial Coverage of Allocation of the Rio Grande Treaty Tributary Water Deficit from Fort Quitman to Falcon Dam (By an exchange of Diplomatic Notes)

Minute 306

Conceptual Framework for United States – Mexico Studies for Future Recommendations Concerning the Riparian and Estuarine Ecology of the Limitrophe Section of the Colorado River and its Associated Delta

Minute 305

Demarcation and Monumentation of the International Boundary on the Bridges over the Rio Grande at Eagle Pass, TX – Piedras Negras, Coahuila II; Laredo, TX – Colombia, Nuevo Leon; Laredo, TX IV – Nuevo Laredo, Tamaulipas III Pharr, TX – Reynosa, Tamaulipas

Minute 304

Joint Grant Contribution Program for Drinking Water and Wastewater Infrastructure Projects for Communities in the US – Mexico Border Area

Minute 303

Operation and Maintenance of the Jointly Financed Works for Solution of the Lower Rio Grande Salinity Problem

Minute 302

Enhanced Demarcation and Monumentation of the International Boundary at International Boundary River Bridges and Land Boundary Port of Entry

Minute 301

Joint Colorado River Water Conveyance Planning Level Study for the San Diego, California-Tijuana, Baja California Region

Minute 300

Operation and Maintenance for the Replacement International Cordova – Bridge of the Americas (Joint Report)

Minute 228

*To take effect at 12:01 a.m., M.D.T., on October 28, 1967

Minute 214

Both Approvals subject to the understanding that, as indicated by its terms, it shall be effective as of date of exchange of ratifications of Chamizal Convention signed August 29, 1963.

Minute 25

Case Closed December 22, 1923.

Minute 24

Case closed December 27, 1923